Skip survey header

Quota Allocation Survey Dec 2017

1.

The SAFETI principles are defined by BCEMB for allocations as follows:

 

Strategic

encourages active engagement from producers and is in line with the BCEMB Strategic Plan

Accountable

is accountable to all industry stakeholders including ensuring the grading stations and consumers have the production types they need

Fair

is fair to all quota holders which may not mean equitable

Effective

the allocation method meets the objectives of BCEMB’s strategic plan

Transparent

easily understandable and clearly defined

Inclusive

all producers and stakeholders have had the opportunity to take part in the consultation and all producers have the ability to take part in any allocations



Do you agree with BCEMB’s SAFETI analysis?
2.
Please rank which of these allocation methods best fulfills the SAFETI principles? You can find more information by clicking on each option: Pro-Rata; Equal Distribution; Region Specific, Production-Type Specific, Variable Allocation
1 = worst fit; 5 = best fit
Note: for the following table each column is restricted to a single answer across all rows.
12345
3. Do you agree that allocations should foster:
Space Cell YesNo
Industry efficiencies throughout the entire sector.
Economic viability by enhancing the viability of the farm and promoting the quick utilization of growth quota.
Organizational capacity by encouraging a varied production mix that meets market demand.
Maintain and support BCEMB’s Strategic Vision.
Be equitable and fair to all quota holders while supporting growing markets, new entrants and small producers.
5.

Please rank which of these allocation methods best fulfills the objectives listed in Question 3 above?
1=worst fit; 5=best fit

Note: for the following table each column is restricted to a single answer across all rows.
12345
6.

Which allocation method do you feel is the most fair?

1=least fair; 5=most fair

Note: for the following table each column is restricted to a single answer across all rows.
12345
7. Which allocation method do you favour?

1=least preferred; 5=most preferred

Note: for the following table each column is restricted to a single answer across all rows.
12345
8.

Are you planning to expand to a different production type than what you are currently producing?

9. If you answered "Yes" or "Unsure" to Question 8 above, please tell us what production type you are planning to expand into. Check all that apply.